What our clients ask
Do I need a building permit?
Yes. We provide the design of the house we deliver. The site documents (topographic survey, site plan) are prepared with a local designer, as they depend on your plot.
What foundation does the house use?
The QuickUp Pile steel pile foundation, included in the system.
What do I need to prepare on site?
Access for a truck and crane, a connection point for utilities (power, water, sewage) and a topographic survey of the plot.
How long until I can move in?
12–16 weeks of factory production, then 2–3 weeks for transport and installation. We install the house ourselves.
Do you deliver across Europe? What does transport cost?
Yes, we deliver across Europe and transport is included in the price.
Does the house come fully finished?
Yes. The house comes finished, ready to move in.
How do I pay?
In five instalments: 1% at project confirmation, 9% to reserve the production slot, 50% at contract and start of production, 20% at delivery and installation, 20% at handover.
What warranty does the house have?
10 years for the structure and the constituent elements of the house; 2 years for finishes.
Can I live in it all year round?
Yes, depending on the equipment you choose (heating, air conditioning).
What is the energy class?
A+.
Can the house be moved later?
Yes.
Can the floor plan be changed?
COOLCUSH models are fixed: modules can only be removed. For more flexibility there are QuickUp houses, configurable by module.
Can I visit a finished house?
Yes, currently in Romania. Write to us and we will arrange a visit.
Do you offer financing?
For clients in Romania we work with a partner bank.